Develop Approaches for Corridor Planning and Allocation

Funding

$350,000

Research Period

18 months

Background Information

• Asset conditions are typically determined currently in separate silos - leading to asset treatments that are applied on varied schedules by asset (pavement, bridges, culverts) even over the same corridor.
• Significant resources may be misallocated on treatments applied at the wrong time due to lack of coordinated corridor planning.
• Corridor planning can organize the asset treatments — while also looking at environmental issues, congestion, and safety
• There may be other issues such as operation needs in a corridor as well.
o “Project delivery” can be achieved more efficiently because projects are organized into a corridor delivery strategy. Projects can be peeled off as funding is available
o Public can be engaged all at once instead of multiple times for multiple projects.
o Minimize contractor costs


Literature Search Summary

• Boadi, Richard S; Amekudzi, Adjo A. Risk-Based Corridor Asset Management: Applying Multiattribute Utility Theory to Manage Multiple Assets. Transportation Research Record: Journal of the Transportation Research Board, Issue 2354, 2013, pp 99–106 https://trid.trb.org/view/1241970
• Anderson, Scott A; Rivers, Benjamin S. Corridor Management: A Means to Elevate Understanding of Geotechnical Impacts on System Performance. Transportation Research Record: Journal of the Transportation Research Board, Issue 2349, 2013, pp 9-15 https://trid.trb.org/view/1241789


Objectives

Develop guidance on an asset management corridor planning process to prioritize and schedule project delivery for cost effectiveness while also considering mobility/accessibility issues, drainage, and more.


Keywords/Terms


Link to 2021-2026 AASHTO Strategic Plan


Urgency and Potential Benefits


Implementation Considerations


Author(s)

Please add at least one champion.

Others Supporting Problem Statement

NMDOT

Fake Person

[email protected]

2345645298

AASHTO

The Person 2

[email protected]

1234567890

AASHTO

The Person

[email protected]

1234567890


Potential Panel Members

Please add at least one potential panel member.

Person Submitting Statement

Please add information about the person submitting the statement.

Notes